Water for a Maternity Hospital, two schools and Navunibitu Parish
The team has built a new large scale new water system for village of Navunibitu, including Ra Maternity Hospital, two schools and the local parish using more than 10km of piping, four tanks installed across three months on site

An image of the men of Navunibitu parish after completing the installation of two of the four water tanks
Project snapshot

Navunitibu
A parish in the North of Viti Levu, Fiji’s largest island
2024
Four months onsite with 12 months total project time
New gravity water system
Uplift an existing water system from a mountain spring

Clean water for 700 people and a hospital
Including women and children from the local community

$120,000
Budget provided from CRS and USAID

Donor
We thank CRS and USAID for their generous contribution
Navunibitu and Ra maternity hospital

An image of the location of Navunibitu in Fiji




An image of the church, welcome sign, crumbling water tank in Navunibitu, and the degraded overpass bringing water from the tank to the community
The Navunibitu water system is one of the largest projects Caritas Fiji has ever done. It involved more than 10km of piping, four water tanks and providing water for more than 700 people, including a maternity hospital.
Navunibitu is an agricultural parish that sits on the dry western side of Viti Levu, Fiji’s largest island. The town has almost 700 people in it, and acts as a hub for the region, with a primary school, a high school, a kindergarten and a local maternity hospital.
Water has always been a challenge for Navunibitu. There are only decent water sources in the area, both of which are springs that are quite far from the village – one is more than 10 kilometers away, across several hills and rivers with some very dense jungle terrain without easy access roads. The other one is about three kilometers away – still not close.
All of the institutions in Navunibitu – the schools, the hospitals and the parish had to regularly ration their use of water. The water supply was highly intermittent, not lasting the full day and sometimes the schools needed to be closed and the hospitals evacuated. There had been a few attempts by different NGOs to solve the issues in Navunibitu, but there had only been limited success.
In Fiji, government support for water in rural communities is very limited. Villages are largely expected to find and manage their own water systems, with the support of various NGOs. Most villages have rudimentary systems directing water from nearby streams to a central tank, but many are aging and unreliable – only providing water for a few hours in the morning, or none at all during the dry season.
Initial assessment and permission from land owners





The images show an empty hospital bed in the Ra maternity unit, because there was no water at the time. There is also an image of the traditional protocols with the land owners, and the Caritas Fiji team riding the area on horseback for the technical assessment and holding a large algal growth that was blocking the old water system
Caritas Fiji was approached by Navunibitu in early 2022 as part of the CRS We Rise Project. Navunibitu is known to have significant issues with their water and be a difficult challenge. Caritas Fiji decided to put their hand up and have a go, despite the known geographical challenges of the mountainous regions and being on the dry side of Fiji.
Caritas Fiji first inspected the site in mid 2023. When we visited the hospital was mostly empty due to water issues and the schools were also regularly being closed early. The team first traveled around Navunibitu assessing the geography and the various challenges in the region, particularly going along the water mainline on horseback. We also did a SevuSevu with the traditional landowners to get their blessing for using their land.
The team really needed to design a highly robust system for Navunibitu. Accessing the water source required climbing up steep cliffs and walking for almost a day, meaning that maintenance was going to be a significant challenge. Like with most Caritas Fiji WASH projects – the team designed a gravity only system – it has no electronics or pumps – to ensure it is able to be cared for by the local community with local resources. This ensures long term sustainability – there are many examples of well-intentioned complex water systems in Fiji being built and then not surviving the Fiji wet season.
Upgrading the water tanks






Images of the materials being transported to Nasalia via truck and then carried by the villagers 500m up the mountain to the construction site.
There were two different sites for tanks added for the Navunibitu project. The first site was at the Parish, where the team placed two 10,000L poly tanks for storage and keeping pressure along the line. The second site was the Ra Maternity hospital where the team placed one 10,000L polyurethane tank to provide water storage for the Maternity hospital.
There were some very significant challenges in these sites. The water system was highly corroded, meaning that most of the pipes had to be replaced from the water source to the tanks. There were many hidden leaks along the lines, at the Maternity hospital, schools and parish due to the age of the infrastructure. The team had to identify each leak individually over the four-month period they stayed on site for the project.
For the first month, the team built the tank basements. The two tanks, when full, weigh over 20 tones, so a significant basement and footing is required to keep them safe and secure long term. This required not only construction, but manual carrying of stones to build the foundations.

Image of the rugged terrain for Navunibitu that shows how far the water source is from the town and hospital
Laying 3.5km of pipe across three hills in the jungle with no power tools




This is the team that worked on upgrading the line from the water source to the tanks, using only hand tools. The 1950s original pipes were galvanized iron; it took almost two hours to cut through one section with a handsaw.
The team upgrading the pipes needed 20 to 30 people. First we needed to carry the new PVC pipes to the site. Then the trenching was required to unearth the original 1950s galvanized iron pipes. Then the original pipes needed to be cut so the could be removed and brought back down to the village. Cutting one of these galvanized iron pipes took almost 2 hours – as the team could only use handsaws in the remote location. The team easily went through one hundred saw blades across the four months of the project.
In between the building the tanks and upgrading the pipes, the water source needed to be assessed and cleaned, so that the amount of water flow could be evaluated.
WASH training for staff and the schools



Images of the primary school, high school and the teachers doing their WASH training
The team then provided WASH training to about 200 primary school students and 300 secondary school students. This involved teaching about good hygiene practices, handwashing techniques and the importance of taking care of the water system.
This is one of the most challenging locations for water in Fiji and one of the most challenging projects the team has done due to the water scarcity and difficult terrain. The project would not have been possible without the generous help of the community, the school and the maternity hospital staff. A good understanding of water systems was required.
Celebration! The village and hospital has water!



Images of the celebration after the tank working with the village
Finally Navunibitu had a reliable water supply after 4 months of work from the local communities and the Caritas Fiji team. The water supply is reliable and plentiful, allowing the schools and the maternity hospital to use water all the time and not have to close. The water system is still functional as of August 2026. Water is fundamental to human dignity and something many people around the world take for granted.
There has been a massive flow on impact from the new water system. First, once the water had been reliably flowing, UNICEF came in and built a double tank stand and brought two new tanks to increase storage at the hospital. Then hospital has expanded its usage of the water by opening a new ablution block with a disability friendly access unit. The primary school also built an additional toilet block and added a new 24-hour backup generator and the secondary school built their own additional 10,000L storage poly tank. A new vocational school has opened up in the area called Australian Pacific Management and Training as a result of the greater water supply.
Follow our facebook page for more updates about this and other projects!